This is the current news about attaching junction boxes to rafters|attic junction boxes 

attaching junction boxes to rafters|attic junction boxes

 attaching junction boxes to rafters|attic junction boxes Mild steel sheet. 18 or 20 or 22 gauge. About $30 for a 4'*4' piece. 22 gauge for new Hondas. 18 for old vw pans. 20 gauge for old vw bodies. It's a personal preference. 22 is way easier to bend than 18, but 18 will take more weld without blowing through. The stuff I get is light gray with an oil film, but black steel would work too

attaching junction boxes to rafters|attic junction boxes

A lock ( lock ) or attaching junction boxes to rafters|attic junction boxes Interested in knowing about the different types of sheet metals and their uses? Get ready to gain all the required information on the topic with our complete guide.

attaching junction boxes to rafters

attaching junction boxes to rafters When running the wiring across the face of the rafters, you need a running board per the NEC, or you'll need to chase the wiring through holes drilled into the rafters. Tin snips, resembling heavy-duty scissors, are the right choice for cutting sheet metal, gutters, and metal roofing. They come in straight-cutting and curved varieties. Straight .
0 · running wire across rafters
1 · running cable across rafters
2 · electrical wiring across rafters
3 · electrical cables across rafters
4 · attic rafters cable boxes
5 · attic junction boxes
6 · attic junction box mounting
7 · attic junction box installation

Try and bend a flat piece of 18 guage metal, the try to do the same thing with 18 guage that has the enhanced structural characteristics of these "ridges" and you can see how much it helps. This it why anything built with sheet metal normally has them.

Junction boxes on rafters are fine but make sure there's at least 1.5" clearance from the back of the junction box to the outside edge of the rafter, since roof sheathing, properly installed, will be nailed with 1.5" penetration into . When running the wiring across the face of the rafters, you need a running board per the NEC, or you'll need to chase the wiring through holes drilled into the rafters.

Mount the J-box to the side of a framing member, such as a wall stud, ceiling rafter or floor beam using two #8 by 1-inch wood screws. Mount the box in such a way that all the cables entering and leaving the box will be set . The junction boxes you want to install could be mounted either way. However, any wires the run over top of the horizontal beams in the attic need to be physically protected if within 6' of the attic opening or within 2' of the . Nothing in the code book that I am aware for cable run on the bottom of rafters where they are not subject to mechanical damage. Junction box is accessible and it is even labelled (a bonus). Looks good to me. Those are cavity measurements, 1m or less so your not walking over wires laying over rafters and 900mm so you can access the junction box. My journey man has never instructed to drill out rafters. You can run a board or .

running wire across rafters

Securely attach the junction box to a stud, rafter or joist. Use wire connectors to secure the wires into the junction box. Follow the National Electrical Code (NEC) when replacing a junction box. Is it ok to mount a junction box to a roof truss support. They are 2x4 in size. The access to the attic is through a hole in my hallway that I have to get a ladder to go up through .Real answer (1) Either do it all in conduit (budget and time permitting) if you want it to be fancy, or (2) use MC cable to get it done quickly and efficiently. Either way, I'd bring it along at the top .

Install proper bracing (a simple 2x4 between the rafters should be fine), and attach the electrical box to it. Then mark, and cut a hole for the electrical box in the soffit cover. Finish by putting . Junction boxes on rafters are fine but make sure there's at least 1.5" clearance from the back of the junction box to the outside edge of the rafter, since roof sheathing, properly installed, will be nailed with 1.5" penetration into the rafter . When running the wiring across the face of the rafters, you need a running board per the NEC, or you'll need to chase the wiring through holes drilled into the rafters. Mount the J-box to the side of a framing member, such as a wall stud, ceiling rafter or floor beam using two #8 by 1-inch wood screws. Mount the box in such a way that all the cables entering and leaving the box will be set back at least 1 .

running wire across rafters

The junction boxes you want to install could be mounted either way. However, any wires the run over top of the horizontal beams in the attic need to be physically protected if within 6' of the attic opening or within 2' of the opening if you have pull-down stairs into the attic area. Nothing in the code book that I am aware for cable run on the bottom of rafters where they are not subject to mechanical damage. Junction box is accessible and it is even labelled (a bonus). Looks good to me. Those are cavity measurements, 1m or less so your not walking over wires laying over rafters and 900mm so you can access the junction box. My journey man has never instructed to drill out rafters. You can run a board or duck in and out if .

Securely attach the junction box to a stud, rafter or joist. Use wire connectors to secure the wires into the junction box. Follow the National Electrical Code (NEC) when replacing a junction box. Is it ok to mount a junction box to a roof truss support. They are 2x4 in size. The access to the attic is through a hole in my hallway that I have to get a ladder to go up through it. The junction box will be 10 feet from the access hole.

Real answer (1) Either do it all in conduit (budget and time permitting) if you want it to be fancy, or (2) use MC cable to get it done quickly and efficiently. Either way, I'd bring it along at the top plate of the wall . with conduit, a junction box .

Install proper bracing (a simple 2x4 between the rafters should be fine), and attach the electrical box to it. Then mark, and cut a hole for the electrical box in the soffit cover. Finish by putting the soffit cover back in place. Junction boxes on rafters are fine but make sure there's at least 1.5" clearance from the back of the junction box to the outside edge of the rafter, since roof sheathing, properly installed, will be nailed with 1.5" penetration into the rafter . When running the wiring across the face of the rafters, you need a running board per the NEC, or you'll need to chase the wiring through holes drilled into the rafters.

Mount the J-box to the side of a framing member, such as a wall stud, ceiling rafter or floor beam using two #8 by 1-inch wood screws. Mount the box in such a way that all the cables entering and leaving the box will be set back at least 1 . The junction boxes you want to install could be mounted either way. However, any wires the run over top of the horizontal beams in the attic need to be physically protected if within 6' of the attic opening or within 2' of the opening if you have pull-down stairs into the attic area. Nothing in the code book that I am aware for cable run on the bottom of rafters where they are not subject to mechanical damage. Junction box is accessible and it is even labelled (a bonus). Looks good to me. Those are cavity measurements, 1m or less so your not walking over wires laying over rafters and 900mm so you can access the junction box. My journey man has never instructed to drill out rafters. You can run a board or duck in and out if .

Securely attach the junction box to a stud, rafter or joist. Use wire connectors to secure the wires into the junction box. Follow the National Electrical Code (NEC) when replacing a junction box. Is it ok to mount a junction box to a roof truss support. They are 2x4 in size. The access to the attic is through a hole in my hallway that I have to get a ladder to go up through it. The junction box will be 10 feet from the access hole. Real answer (1) Either do it all in conduit (budget and time permitting) if you want it to be fancy, or (2) use MC cable to get it done quickly and efficiently. Either way, I'd bring it along at the top plate of the wall . with conduit, a junction box .

running cable across rafters

electrical wiring across rafters

electrical cables across rafters

sheet metal houston texas

Cool idea. Use an old box spring and hang from the ceiling with doilies around the edges.

attaching junction boxes to rafters|attic junction boxes
attaching junction boxes to rafters|attic junction boxes.
attaching junction boxes to rafters|attic junction boxes
attaching junction boxes to rafters|attic junction boxes.
Photo By: attaching junction boxes to rafters|attic junction boxes
VIRIN: 44523-50786-27744

Related Stories